V-MARK TRAFFIC PRIMER

V-MARK TRAFFIC PRIMER

V-MARK TRAFFIC PRIMER

PURCHASE

Detail

INGREDIENT

PRODUCT CHARACTERISTICS

The paint in the barrel is a homogeneous liquid without lumps, not precipitate.
Easy to clean by brush, roller and sprayer.
Alkali resistance and best weather resistance.
Durable with water
Hard, solid porcelain, hard to scratch.
Great cover. Cover all dark old paint stains to create a homogeneous white surface

Technical Specification V-MARK TRANSPORTATION

 

Numerical order

Name of indicator

 

Unit

Technical requirements TCVN 8791-2011

Experimental methods

Experimental results

1

Color

----

Crystal-clear

ASTM D 6628-03

Crystal-clear

2

 

Drying time (with 2 mm thickness)

Air temperature 32 ± 2 oC

 

 

Minute

Max 15

TCVN 2096:1993

 

12,40

3

Impact resistance

kG.cm

Min 50

TCVN 2100 : 2007

52,00

4

Bending strength

mm

Max 2

TCVN 2099 : 1993

1,20

5

Adhesion to the background

%

100

64TCN 93-95

100

6

Oil resistance at 25oC for 1h

----

No flaking, blistering

TCVN 8787 : 2011

No flaking, blistering

7

Resistance to salt: soaked in 20% NaCl solution at 25 ° C for 18 hours

 

----

No flaking, blistering

TCVN 8787 : 2011

No flaking, blistering

8

Alkali resistance: soaked in 20% NaOH solution at 25 ° C for 48 h

 

----

No flaking, blistering

TCVN 8787 : 2011

No flaking, blistering

9

Water retention: Soak in water at 25oC for 72 hours

----

No flaking, blistering

TCVN 8787 : 2011

No flaking, blistering

PASSIONAL REGIME
Dilution on request from 10 - 30%

WORK GUIDE
The essential construction tools: Roller. Brush. Water bucket charging

Step 1: Clean and moisten the wall surface

- Dry wall from inside to outside. Use abrasive grit or paper 40 to remove excess impurities on the wall. For old walls, you must remove old paint.

- Use a damp roller to wet the dirt for the purpose of cleaning dirt and at the same time damp the wall within the scaffolding on the scaffold.

Step 2: Rinse the mattit immediately after the wetted wall is still wet:

Step 3: Apply V-MARK primer from 1 to 2 layers
Prior to priming, wet the masonry wall so that the primer penetrates the floor.
Moisten the walls to wherever you roll the V-MARK primer to it. The damp wall will draw the primer deep into the floor. Drying time of primer coat is about 30 minutes to 1 hour depending on weather and humidity. Continue rolling the second coat.

CAPITAL AREA:

1 kg of V-MARK primer is about 6 - 7 m2 / 2 layers.

PRESERVATION
Store in covered steel enclosure in cool place protected from direct sunlight
Shelf life is 3 years from the date of manufacture

SAFETY AND ENVIRONMENTAL INFORMATION
-
Keep out of reach of children
- Do not empty into drains and water courses
- The surface treatment before painting such as sanding, burning old paint ... can create harmful gas and dust is not good for community health.
- Avoid contact with skin and eyes. Immediately wash with soap and water. Do not use solvents or alcohol for washing.
In case of splashing, wash immediately with plenty of water and seek medical advice
- If swallowed, take the label to medical center for treatment

PACK :

Lon 18kg

Hotline: +84 938 100 477